|
|
Hindrance: major (weekday) |
Start:
End:
Update: |
July 4, 2025 at 7 a.m.
July 4, 2025 at 6 p.m.
June 26, 2025 at 4:11 p.m.
|
|
Direction(s): |
West and east |
|
Location: |
À Hébertville, rang Saint-André, sur le pont du Lac Kénogamichiche |
|
Work Type: |
Inspection de structure
|
|
Hindrance: |
Pont fermé, vendredi entre 7 h et 18 h |
|
Detours and Alternate Routes: |
Rang du Lac-Vert, rue Turgeon, rang Saint-Isidore, rang Saint-André |
|
|