|
15
|
Hindrance: minor (weekday) |
Start:
End:
Update: |
August 19, 2025 at 9 a.m.
August 19, 2025 at 4 p.m.
August 15, 2025 at 1:16 p.m.
|
|
Direction(s): |
South and north |
|
Location: |
À Val-David, au niveau du 7e Rang (km 80) |
|
Work Type: |
Inspection structure
|
|
Hindrance: |
Fermeture de 1 voie sur 2, mardi entre 9 h et 16 h |
|
|