Québec 511 > Road Conditions > Worksite in Detail
 
138
Hindranceminor (weekday) Start:
End:
Update:
July 2, 2025 at 12:30 p.m.
July 2, 2025 at 4 p.m.
June 26, 2025 at 6:34 a.m.

Direction(s): West and east
Location: Entre L'Ange-Gardien et Château-Richer, sur le pont de la rivière du Petit Pré
Work Type: Inspection de structure
Hindrance: Fermeture de 1 voie sur 2, mercredi entre midi 30 et 16 h


Top of the page.