|
351
|
Hindrance: minor (weekday) |
Start:
End:
Update: |
June 18, 2025 at 9 a.m.
June 18, 2025 at 12 p.m.
June 6, 2025 at 2:42 p.m.
|
|
Direction(s): |
South and north |
|
Location: |
À Shawinigan, sur le chemin de Saint-Gérard, au pont situé au-dessus du ruisseau de la Ferme. |
|
Work Type: |
Inspection de structure
|
|
Hindrance: |
Circulation en alternance, entre 9 h et midi. |
|
|