Québec 511 > Road Conditions > Worksite in Detail
 
354
Hindrancemajor (weekday) Start:
End:
Update:
June 16, 2025 at 7 a.m.
June 18, 2025 at 6 p.m.
June 11, 2025 at 6:42 a.m.

Direction(s): West and east
Location: À Saint-Casimir, sur le pont de la rivière Sainte-Anne
Work Type: Inspection de structure
Hindrance: Circulation en alternance, du lundi au mercredi entre 7 h et 18 h
Details: Limite de vitesse: 35 km/h


Top of the page.