|
40
|
Hindrance: minor (weekday) |
Start:
End:
Update: |
May 13, 2025 at 2:30 p.m.
May 13, 2025 at 4 p.m.
April 30, 2025 at 11:18 a.m.
|
|
Direction(s): |
West |
|
Location: |
À Sainte-Geneviève-de-Batiscan, au pont situé au-dessus de la rivière Batiscan. |
|
Work Type: |
Inspection de structure (P-14871N)
|
|
Hindrance: |
Fermeture d'une voie sur deux, entre 14 h 30 et 16 h. |
|
|