Québec 511 > Road Conditions > Worksite in Detail
 
     
Hindrancemajor (weekday) Start:
End:
Update:
April 30, 2025 at 7 a.m.
April 30, 2025 at 7 p.m.
April 29, 2025 at 3:02 p.m.

Direction(s): South and north
Location: À Roxton Pond
Boulevard David-Bouchard
Au Sud de la rue du Vignoble
Work Type: Carottage de la chaussée
Hindrance: Circulation en alternance
Mercredi entre 7 h et 19 h
Hindrances Related to Load and Size: Largeur de la voie réduite à 3,4 mètres


Top of the page.