Québec 511 > Road Conditions > Worksite in Detail
 
261
Hindranceminor (weekday) Start:
End:
Update:
May 5, 2025 at 7 a.m.
May 23, 2025 at 7 p.m.
April 25, 2025 at 1:52 p.m.

Direction(s): South and north
Location: À Bécancour, sur le boulevard du Parc-Industriel, près du boulevard Bécancour.
Work Type: Réfection de route
Hindrance: Circulation en alternance, du lundi au vendredi, entre 7 h et 19 h.


Top of the page.