|
132
|
Hindrance: minor (weekday) |
Start:
End:
Update: |
July 15, 2025 at 6:30 a.m.
July 15, 2025 at 8 p.m.
July 10, 2025 at 7:30 a.m.
|
|
Direction(s): |
West and east |
|
Location: |
À Saint-Anne-des-Monts, sur le pont de la rivière Sainte-Anne |
|
Work Type: |
Inspection de structure
|
|
Hindrance: |
Circulation en alternance, mardi entre 6 h 30 et 20 h |
|
Hindrances Related to Load and Size: |
Largeur de la voie réduite à 5 mètres |
|
|