Québec 511 > Road Conditions > Worksite in Detail
 
     
Hindranceminor (weekday) Start:
End:
Update:
July 8, 2025 at 6:30 a.m.
July 8, 2025 at 8 p.m.
July 3, 2025 at 6:38 a.m.

Direction(s): West and east
Location: À La Rédemption, route du Portage, sur le pont de la rivière Rouge
Work Type: Inspection de structure
Hindrance: Circulation en alternance, mardi entre 6 h 30 et 20 h
Hindrances Related to Load and Size: Largeur de la voie réduite à 3 mètres


Top of the page.