|
|
Hindrance: minor (weekday) |
Start:
End:
Update: |
June 16, 2025 at 6:30 a.m.
June 16, 2025 at 8 p.m.
June 11, 2025 at 6:23 a.m.
|
|
Direction(s): |
West and east |
|
Location: |
À Bonaventure, route Henry, sur le pont de la rivière Hall |
|
Work Type: |
Inspection de structure
|
|
Hindrance: |
Pont fermé, lundi entre 6 h 30 et 20 h |
|
Details: |
Durée des travaux: 1 h 30
|
|
|