Québec 511 > Road Conditions > Worksite in Detail
 
     
Hindranceminor (weekday) Start:
End:
Update:
June 16, 2025 at 6:30 a.m.
June 16, 2025 at 8 p.m.
June 11, 2025 at 6:22 a.m.

Direction(s): West and east
Location: À Saint-Elzéar, route de la Traverse, sur le pont de la rivière Hall
Work Type: Inspection de structure
Hindrance: Circulation en alternance, lundi entre 6 h 30 et 20 h
Hindrances Related to Load and Size: Largeur de la voie réduite à 4,5 mètres


Top of the page.