Québec 511 > Road Conditions > Worksite in Detail
 
138
Hindranceminor (weekday) Start:
End:
Update:
April 1, 2025 at 7 a.m.
June 30, 2025 at 5 p.m.
March 20, 2025 at 8:54 a.m.

Direction(s): In one direction at a time
Location: À Batiscan, sur la rue Principale, au pont situé au-dessus de la rivière Batiscan.
Work Type: Entretien de structure (P-01559)
Hindrance: Circulation en alternance occasionnelle.
Présence de travailleurs, entre 7 h et 17 h.


Top of the page.