Québec 511 > Road Conditions > Worksite in Detail
 
40
Hindranceminor (weekday) Start:
End:
Update:
May 11, 2025 at 9 p.m.
May 12, 2025 at 7 a.m.
May 9, 2025 at 9:04 a.m.

Direction(s): East
Location: À Repentigny, pont Benjamin-Moreau
Work Type: Inspection structure
Hindrance: Fermeture de 1 voie sur 3
De dimanche 21 h à lundi 7 h


Top of the page.