Québec 511 > Road Conditions > Worksite in Detail
 
973
HindranceMinor (weekday) Start:
End:
Update:
July 27, 2026 at 8 p.m.
July 30, 2026 at 5 a.m.
July 22, 2026 at 9:18 a.m.

Direction(s): South
Location: À Québec, sur le pont de la rivière Saint-Charles
Work Type: Entretien
Hindrance: Fermeture de 1 voie sur 3, du dimanche au mercredi entre 20 h et 5 h le lendemain


Top of the page.