Québec 511 > Road Conditions > Worksite in Detail
 
155
HindranceMinor (weekday) Start:
End:
Update:
July 7, 2026 at 7 a.m.
July 7, 2026 at 6 p.m.
July 2, 2026 at 4:48 p.m.

Direction(s): South and north
Location: À Grandes-Piles, à la hauteur du chemin de la Rive
Work Type: Asphaltage
Hindrance: Circulation en alternance
Hindrances Related to Load and Size: Largeur de la voie réduite à 4 mètres


Top of the page.