Québec 511 > Road Conditions > Worksite in Detail
 
169
HindranceMinor (weekday) Start:
End:
Update:
July 7, 2026 at 8 a.m.
July 7, 2026 at 5 p.m.
July 2, 2026 at 8:16 a.m.

Direction(s): South and north
Location: À Roberval, sur le pont de la rivière Ouiatchouaniche
Work Type: Inspection de structures
Hindrance: Circulation en alternance


Top of the page.