Québec 511 > Road Conditions > Worksite in Detail
 
167
HindranceMinor (weekday) Start:
End:
Update:
July 8, 2026 at 8 a.m.
July 10, 2026 at 5 p.m.
July 3, 2026 at 7:39 a.m.

Direction(s): South and north
Location: Secteur Lac-Ashuapmushuan, sur le pont de la rivière Ashuapmushuan
Work Type: Inspection de structure
Hindrance: Circulation en alternance, du mercredi au vendredi entre 8 h et 17 h


Top of the page.