Québec 511 > Road Conditions > Worksite in Detail
 
40
HindranceMajor (weekday) Start:
End:
Update:
July 7, 2026 at 8:30 a.m.
July 8, 2026 at 4:30 p.m.
July 2, 2026 at 8:20 a.m.

Direction(s): West
Location: À Sainte-Geneviève-de-Batiscan, sur le pont de rivière Batiscan
Work Type: Inspection de structure
Hindrance: Fermeture de 1 voie sur 2, mardi et mercredi entre 8 h 30 et 16 h 30


Top of the page.