Québec 511 > Road Conditions > Worksite in Detail
 
138
HindranceMinor (weekday) Start:
End:
Update:
June 15, 2026 at 7 a.m.
June 18, 2026 at 6 p.m.
June 11, 2026 at 11:23 a.m.

Direction(s): In one direction at a time
Location: À Baie--Comeau, entre le chemin des Étangs-de-Marquette et l'avenue Damase-Potvin
Work Type: Asphaltage
Hindrance: Fermeture de 1 voie sur 2, du lundi au jeudi entre 7 h et 18 h


Top of the page.