Québec 511 > Road Conditions > Worksite in Detail
 
167
HindranceMinor (weekday) Start:
End:
Update:
June 3, 2026 at 6 a.m.
June 5, 2026 at 6 p.m.
June 2, 2026 at 3:13 p.m.

Direction(s): South and north
Location: Secteur Lac Ashuapmushuan, entre le km 113 et le km 115
Work Type: Réfection de la chaussée
Hindrance: Circulation en alternance, du mercredi au vendredi entre 6 h et 18 h
Hindrances Related to Load and Size: Largeur de la voie réduite à 3,5 mètres


Top of the page.