Québec 511 > Road Conditions > Worksite in Detail
 
     
HindranceMinor (weekday) Start:
End:
Update:
June 8, 2026 at 7 a.m.
July 2, 2026 at 5 p.m.
June 3, 2026 at 6:37 a.m.

Direction(s): South and north
Location: À Eeyou Istchee Baie-James, route de Chibougamau, entre les km 3 et 4
Work Type: Reconstruction de ponceaux
Hindrance: Circulation sur voies rétrécies, du lundi au jeudi entre 7 h et 17 h
Hindrances Related to Load and Size: Largeur des voies réduite à 5 mètres


Top of the page.