Québec 511 > Road Conditions > Worksite in Detail
 
73
HindranceMinor (weekday) Start:
End:
Update:
June 11, 2026 at 1 p.m.
June 12, 2026 at 4 p.m.
June 8, 2026 at 6:38 a.m.

Direction(s): North
Location: À Saint-Joseph-de-Beauce, sur le pont de la rivière Calway
Work Type: Inspection de structure
Hindrance: Fermeture de 1 voie sur 2
- Jeudi entre 13 h et 17 h
- Vendredi entre 8 h 30 et 16 h


Top of the page.