|
|
|
73
|
Hindrance: Major (weekday) |
Start:
End:
Update: |
June 8, 2026 at 9 p.m.
June 9, 2026 at 5 a.m.
June 3, 2026 at 7:14 a.m.
|
|
|
Direction(s): |
North |
|
|
Location: |
À Lévis, sur le pont de la rivière Chaudière |
|
|
Work Type: |
Inspection de structure
|
|
|
Hindrance: |
Fermeture de 2 voies sur 3 |
|
|
|