Québec 511 > Road Conditions > Worksite in Detail
 
     
HindranceMajor (weekday) Start:
End:
Update:
July 28, 2026 at 8:30 a.m.
July 28, 2026 at 4:30 p.m.
July 20, 2026 at 11:59 a.m.

Direction(s): West and east
Location: À La Tuque, route 25, sur le pont de la rivière Vermillon
Work Type: Inspection de structure
Hindrance: Pont fermé
Details: Réouverture du pont entre 10 h et 10 h 30, entre 12 h et 13 h, entre 14 h 30 et 15 h


Top of the page.