Québec 511 > Road Conditions > Worksite in Detail
 
105
HindranceMajor (weekday) Start:
End:
Update:
May 25, 2026 at 7 a.m.
July 15, 2026 at 5 p.m.
May 15, 2026 at 3:16 p.m.

Direction(s): South and north
Location: Sur la route 105, entre le chemin Principal, à Low, et le chemin Lacharity, à Venosta,
Work Type: Planage et resurfaçage
Hindrance: circulation en alternance, du lundi au vendredi, entre 7 h et 17 h
Hindrances Related to Load and Size: Voie réduite à 3,5 mètres.


Top of the page.