Québec 511 > Road Conditions > Worksite in Detail
 
30
HindranceMinor (weekday) Start:
End:
Update:
May 10, 2026 at 8 p.m.
May 11, 2026 at 5 a.m.
May 8, 2026 at 2:14 p.m.

Direction(s): West
Location: À Sainte-Julie entre montée Sainte-Julie et chemin de la Belle-Rivière
Work Type: Réfection des structures de signalisation
Hindrance: Fermeture d'une voie sur 2
Public Transit:


Top of the page.