Québec 511 > Road Conditions > Worksite in Detail
 
15
HindranceMinor (weekday) Start:
End:
Update:
May 13, 2026 at 6 a.m.
May 14, 2026 at 6 p.m.
May 11, 2026 at 2:22 p.m.

Direction(s): South
Location: À Piedmont, sur le pont de la rivière à Simon (km 63)
Work Type: Réparation de la chaussée
Hindrance: Fermeture de 1 voie sur 2, mercredi et jeudi entre 6 h et 18 h


Top of the page.