Québec 511 > Road Conditions > Worksite in Detail
 
138
HindranceMinor (weekday) Start:
End:
Update:
June 1, 2026 at 7 a.m.
June 1, 2026 at 6 p.m.
May 27, 2026 at 8:44 a.m.

Direction(s): West and east
Location: À Rivière-au-Tonnerre, sur le pont de la rivière Sheldrake
Work Type: Inspection de structure
Hindrance: Circulation en alternance


Top of the page.