Québec 511 > Road Conditions > Worksite in Detail
 
     
HindranceMinor (weekday) Start:
End:
Update:
May 5, 2026 at 9 a.m.
May 8, 2026 at 3 p.m.
April 30, 2026 at 6:55 a.m.

Direction(s): South and north
Location: À Québec, boulevard de l'Ormière, à la hauteur de l'A-40
Work Type: Reconstruction de ponts
Hindrance: Fermeture de 1 voie sur 2, du mardi au vendredi entre 9 h et 15 h


Top of the page.