Québec 511 > Road Conditions > Worksite in Detail
 
349
HindranceMinor (weekday) Start:
End:
Update:
May 6, 2026 at 7 a.m.
May 6, 2026 at 9:30 a.m.
April 28, 2026 at 2:34 p.m.

Direction(s): In one direction at a time
Location: À Saint-Léon-le-Grand, à proximité de la rie de la Fabrique.
Work Type: Forages
Hindrance: Travaux mobiles, entre 7 h et 9 h 30.
Circulation en alternance sur 500 mètres à la fois.


Top of the page.