|
|
|
20
|
Hindrance: Minor (weekday) |
Start:
End:
Update: |
April 29, 2026 at 6 a.m.
May 1, 2026 at 6 p.m.
April 28, 2026 at 12:37 p.m.
|
|
|
Direction(s): |
In one direction at a time |
|
|
Location: |
Entre la R-132 à La Pocatière et la R-287 à Saint-Philippe-de-Néri |
|
|
Work Type: |
Réfection d'un pont
|
|
|
Hindrance: |
Fermeture de 1 voie sur 2, du mercredi au vendredi entre 6 h et 18 h |
|
|
Details: |
Travaux mobiles
|
|
|
|