Québec 511 > Road Conditions > Worksite in Detail
 
     
HindranceMinor (weekday) Start:
End:
Update:
April 29, 2026 at 7 a.m.
May 7, 2026 at 5 p.m.
April 24, 2026 at 10:22 a.m.

Direction(s): In one direction at a time
Location: À Saint-Pierre-Baptiste, sur la route Roy, au pont situé au-dessus du ruisseau Golden.
Work Type: Réparation de structure
Hindrance: Circulation en alternance, entre 7 h et 17 h, du lundi au jeudi.


Top of the page.