|
|
|
360
|
Hindrance: Minor (weekday) |
Start:
End:
Update: |
April 28, 2026 at 9 a.m.
April 28, 2026 at 2 p.m.
April 23, 2026 at 10:56 a.m.
|
|
|
Direction(s): |
West and east |
|
|
Location: |
Entre Saint-Ferréol-les-Neiges et Saint-Tite-des-Caps, sur le le pont de la rivière Saint-Anne |
|
|
Work Type: |
Inspection de structure
|
|
|
Hindrance: |
Circulation en alternance |
|
|
|