Québec 511 > Road Conditions > Worksite in Detail
 
329
HindranceMinor (weekday and weekend) Start:
End:
Update:
April 26, 2026 at 9 p.m.
June 12, 2026 at 11:59 p.m.
April 28, 2026 at 10:39 a.m.

Direction(s): South and north
Location: À Lachute, sur le pont de la rivière du Nord
Work Type: Réfection de la structure
Hindrance: Circulation en alternance, en tout temps
Hindrances Related to Load and Size: Largeur de la voie réduite à 3,3 mètres


Top of the page.