Québec 511 > Road Conditions > Worksite in Detail
 
20
HindranceMinor (weekday) Start:
End:
Update:
April 23, 2026 at 9 a.m.
May 8, 2026 at 6 p.m.
April 15, 2026 at 1:43 p.m.

Direction(s): East
Location: À Daveluyville, à proximité de la sortie 220 (Route 261, Bécancour, Daveluyville, Victoriaville).
Work Type: Forages
Hindrance: Fermeture d'une voie sur deux, entre 7 h et 18 h.


Top of the page.