|
|
|
|
Hindrance: Minor (weekday) |
Start:
End:
Update: |
June 2, 2026 at 6:30 a.m.
June 2, 2026 at 8 p.m.
May 28, 2026 at 6:34 a.m.
|
|
|
Direction(s): |
South and north |
|
|
Location: |
À Grosses-Roches, rue Monseigneur-Ross, sur le pont du ruisseau des Grosses Roches |
|
|
Work Type: |
Inspection de structure
|
|
|
Hindrance: |
Circulation en alternance |
|
|
Hindrances Related to Load and Size: |
Largeur de la voie réduite à 3,5 mètres |
|
|
|