Québec 511 > Road Conditions > Worksite in Detail
 
     
HindranceMinor (weekday) Start:
End:
Update:
May 28, 2026 at 6:30 a.m.
May 28, 2026 at 8 p.m.
May 25, 2026 at 6:44 a.m.

Direction(s): West and east
Location: À Causapscal, chemin du Rang B, sur le pont de la rivière Matapédia
Work Type: Inspection de structure
Hindrance: Circulation en alternance
Hindrances Related to Load and Size: Largeur de la voie réduite à 3 mètres


Top of the page.