Québec 511 > Road Conditions > Worksite in Detail
 
116
HindranceMinor (weekday) Start:
End:
Update:
April 28, 2026 at 8:30 p.m.
April 29, 2026 at 6 a.m.
April 20, 2026 at 9:50 a.m.

Direction(s): In one direction at a time
Location: À Lyster, au pont situé au-dessus de la rivière Bécancour.
Work Type: Entretien de structure
Hindrance: Circulation en alternance, entre 20 h 30 et 6 h le lendemain.
Details: Limite de vitesse réduite à 70 km/h.


Top of the page.