Québec 511 > Road Conditions > Worksite in Detail
 
     
HindranceMinor (weekday) Start:
End:
Update:
April 22, 2026 at 8:30 p.m.
April 23, 2026 at 6 a.m.
April 13, 2026 at 11:26 a.m.

Direction(s): In one direction at a time
Location: À Saint-Léonard-d'Aston, sur la route 155, au pont situé au-dessus de la rivière Nicolet.
Work Type: Entretien de structure
Hindrance: Circulation en alternance, entre 20 h 30 et 6 h le lendemain.
Details: Limite de vitesse réduite à 70 km/h.


Top of the page.