|
|
|
350
|
Hindrance: Minor (weekday) |
Start:
End:
Update: |
April 28, 2026 at 7 a.m.
April 29, 2026 at 6 p.m.
April 20, 2026 at 9:38 a.m.
|
|
|
Direction(s): |
In one direction at a time |
|
|
Location: |
À Saint-Paulin, au pont situé au-dessus de la rivière du Loup. |
|
|
Work Type: |
Entretien de structure
|
|
|
Hindrance: |
Circulation en alternance, entre 7 h et 18 h. |
|
|
|