Québec 511 > Road Conditions > Worksite in Detail
 
     
HindranceMinor (weekday) Start:
End:
Update:
May 26, 2026 at 6:30 a.m.
May 26, 2026 at 8 p.m.
May 21, 2026 at 9:35 a.m.

Direction(s): West and east
Location: À Sayabec, route Rioux, sur le pont de la rivière Saint-Pierre
Work Type: Inspection de structure
Hindrance: Circulation en alternance
Hindrances Related to Load and Size: Largeur de la voie réduite à 4,5 mètres


Top of the page.