Québec 511 > Road Conditions > Worksite in Detail
 
     
HindranceMajor (weekday and weekend) Start:
End:
Update:
April 13, 2026 at 7 a.m.
December 21, 2026 at 6 p.m.
April 8, 2026 at 11:35 a.m.

Direction(s): In one direction at a time
Location: À Notre-Dame-de-Lourdes, sur les rangs Saint-Louis Est et Ouest, à l'intersection de la route 265.
Work Type: Reconstruction de pont
Hindrance: Circulation en alternance, en tout temps.
Hindrances Related to Load and Size: Véhicules lourds en surcharge interdit.
Virage à droite vers la route 265 interdit.


Top of the page.