Québec 511 > Road Conditions > Worksite in Detail
 
173
HindranceMinor (weekday) Start:
End:
Update:
April 6, 2026 at 9 a.m.
April 10, 2026 at 3 p.m.
April 1, 2026 at 7:53 a.m.

Direction(s): South and north
Location: À Saint-Georges, sur le pont de la rivière Famine
Work Type: Inspection de structure
Hindrance: Fermeture de 1 voie sur 2, du lundi au vendredi entre 9 h et 15 h
Details: Durée des travaux : 6 h


Top of the page.