Québec 511 > Road Conditions > Worksite in Detail
 
     
HindranceMinor (weekday) Start:
End:
Update:
March 30, 2026 at 7 a.m.
April 2, 2026 at 5 p.m.
March 18, 2026 at 2:34 p.m.

Direction(s): In one direction at a time
Location: À La Tuque, sur la route 461 (Route 25), au kilomètre 33, au pont situé au-dessus de la rivière Vermillon.
Work Type: Travaux préparatoires
Hindrance: Circulation en alternance, entre 7 h et 17 h.
Attente maximum 10 minutes


Top of the page.