Québec 511 > Road Conditions > Worksite in Detail
 
138
HindranceMinor (weekday) Start:
End:
Update:
July 20, 2026 at 12 p.m.
July 20, 2026 at 5 p.m.
July 15, 2026 at 8:35 a.m.

Direction(s): In one direction at a time
Location: Entre L'Ange-Gardien et Château-Richer, sur le pont de la rivière du Petit Pré
Work Type: Inspection de structure
Hindrance: Fermeture de 1 voie sur 2


Top of the page.