Québec 511 > Road Conditions > Worksite in Detail
 
263
HindranceMinor (weekday) Start:
End:
Update:
June 15, 2026 at 12 a.m.
June 19, 2026 at 11:59 p.m.
June 11, 2026 at 6:44 a.m.

Direction(s): South and north
Location: À Saint-Fortunat, sur le pont de la rivière Bulstrode
Work Type: Réfection de structure
Hindrance: Circulation en alternance en tout temps
Hindrances Related to Load and Size: Largeur de la voie réduite à 4 mètres


Top of the page.