Québec 511 > Road Conditions > Worksite in Detail
 
269
HindranceMinor (weekday) Start:
End:
Update:
April 1, 2026 at 7 a.m.
April 2, 2026 at 6 p.m.
March 30, 2026 at 6:40 a.m.

Direction(s): South and north
Location: À Saint-Théophile, sur le pont de la rivière du Loup
Work Type: Inspection de structure
Hindrance: Circulation en alternance, mercredi et jeudi entre 7 h et 18 h
Details: Durée des travaux : 5 h


Top of the page.