Québec 511 > Road Conditions > Worksite in Detail
 
73
HindranceMinor (weekday) Start:
End:
Update:
April 6, 2026 at 7 a.m.
April 10, 2026 at 6 p.m.
April 1, 2026 at 7:52 a.m.

Direction(s): South
Location: À Sainte-Marie, sur le pont de la rivière Bélair
Work Type: Inspection de structure
Hindrance: Fermeture de 1 voie sur 2, du lundi au vendredi entre 7 h et 18 h
Details: Durée des travaux : 5 h


Top of the page.