Québec 511 > Road Conditions > Worksite in Detail
 
73
HindranceMajor (weekday and weekend) Start:
End:
Update:
March 29, 2026 at 10 p.m.
April 17, 2026 at 5 a.m.
March 25, 2026 at 6:22 a.m.

Direction(s): North
Location: À Lévis (Saint-Nicolas), sur le pont de la rivière Chaudière
Work Type: Inspection de structure
Hindrance: Du dimanche au jeudi entre 22 h et 5 h le lendemain
- Fermeture de 2 voies sur 3


Top of the page.